Across the hyperscale ecosystem, the aim is to reduce time-to-market and scale fast, often accelerating by a factor of two the deployment of data center capabilities – including the construction of network infrastructure such as data center interconnects (DCIs). This translates to significant time pressure on the installation and certification of high fiber count cables (with 6,912 fibers per cable in a typical data center campus) that connect data centers.
Click here to download PDF.
Data Center Interconnect (DCI) Solutions
For Construction and Commissioning Together, we can deliver high quality DCI links faster than ever